LOCAL
Sunshine Bridge eastbound set for intermittent closures Aug. 3
Staff Writer
Plaquemine Post South

BATON ROUGE - There will be intermittent complete road closures on La. 70 eastbound at the Sunshine Bridge on Saturday, Aug. 3, 2013 from 8 a.m. – 5 p.m.
These eastbound closures will occur for 15 minutes at a time. These closures are needed for the removal of concrete barriers on the eastbound side of the Sunshine Bridge.
Once this is completed, both eastbound lanes on the Sunshine Bridge will be restored.
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.